Services

About Kitchen Renovation

Kitchen Renovation Packages

When to Plan Your Kitchen Renovation

What’s Included in a Kitchen Renovation

Completed Kitchen Renovation Projects

Kitchen Renovation Gallery

Kitchen Renovation FAQs

About Kitchen Renovation

The kitchen is the heart of every home — and one of the most used, most judged, and most expensive areas to renovate.

Whether you’re a home cook, hosting friends, or just need more storage and cleaner lines, a kitchen renovation can dramatically improve your daily experience. But it’s not just about design — it’s about long-term durability, waterproofing, and smart functionality.

Common kitchen reno goals:

• Maximize countertop & storage space
• Improve ventilation & lighting
• Replace old tiles & fittings
• Upgrade appliances and sockets

At Renomoji, we connect you with ID firms who’ve renovated hundreds of kitchens in HDB flats — from compact 2-room units to spacious 5-room layouts — using durable materials, smart layouts, and practical planning.

Kitchen Renovation Packages

Here’s a typical price range for HDB kitchen renovations in Singapore:

Flat Type

Cost Range (Kitchen Only)

2–3 Room Flats

$6,000 – $10,000

4–5 Room Flats

$8,000 – $15,000

Resale Flats (Full Overhaul)

$12,000 – $20,000+

What’s usually included:

  • Hacking of wall & floor tiles (if needed)
  • Tiling & waterproofing
  • Plumbing (sink, tap, gas points)
  • Electrical points (oven, hood, fridge)
  • Custom kitchen carpentry (top & bottom cabinets)
  • Soft-close hinges & solid surfaces (e.g. quartz countertops)
  • Optional: glass backing, lighting strips, built-in bins, dish racks

When to Plan Your Kitchen Renovation

If you’re doing a standalone kitchen renovation (not full-home), here’s your ideal timeline:

1

1–2 Months Before Renovation

Take measurements or floor plan

Decide on L-shape, galley, or open concept layout

Request quotes and compare designs

2

1 Month Before Renovation

Finalise cabinet layout, materials & colour scheme

Choose countertop, backsplash, appliances

Schedule start date & delivery of materials

3

Kitchen Works (2–3 weeks)

Hacking & wet works (1 week)

Tiling, plumbing & electrical (1 week)

Carpentry fabrication & installation (1–2 weeks)

Tip: Always buffer 10–15% for unexpected costs — like wiring upgrades or additional shelves.

Ready to Start Your Kitchen Renovation?

No pressure. Just practical advice and trusted ID recommendations.

What’s Included in a Kitchen Renovation

Your ID will help maximise space while keeping flow, access, and safety in mind — especially for compact kitchens.

Here’s a breakdown of what most HDB kitchen renos include:

Wet Works & Tiling

  • Hacking of existing floor & wall tiles
  • Laying new anti-slip tiles
  • Cement screed & waterproofing

Electrical & Plumbing

  • Power points for appliances (hob, hood, oven, fridge, etc.)
  • Lighting points & under-cabinet LED strips
  • Sink, mixer tap, inlet/outlet piping
  • Optional: gas pipe & heater installation

Custom Carpentry

  • Top & bottom cabinets (laminate or PU finish)
  • Quartz or solid surface countertops
  • Soft-close hinges, cutlery tray, dish rack
  • Optional: glass backsplash, tall units, pull-out pantry

Finishing & Accessories

  • Painting, wall backing, dish holder installation
  • Optional: service yard enclosure, laundry corner

Completed Kitchen Renovation Projects

All kitchens were built for everyday functionality — with smart storage, clean lines, and durable surfaces.

Here are real HDB kitchen transformations done by ID firms on Renomoji:

#

Project

Address

Year Completed

1

Alkaff Breeze

Toa Payoh / Bidadari

2024

2

Champions Bliss

Tengah

2024

3

Parc Glen

Tengah

2024

4

Grove Spring

Yishun

2024

5

Harmony Village

Bukit Batok

2024

6

Northshore Straits View

Punggol

2024

7

Punggol Point District

Punggol

Jan 2025

8

Chencharu Green

Yishun

Feb 2025

9

Chencharu Vine

Yishun

Feb 2025

10

Stirling Horizon

Woodlands

Feb 2025

11

Tanjong Rhu Parc Front

Kallang/Whampoa

Feb 2025

12

Majestic Green

Tengah

Q1 2025

13

Farrer Park Arena

Kallang/Whampoa

Q1 2025

14

West Glades @ Bukit Batok

Bukit Batok

Late 2024–Q1 2025

15

Tampines GreenOpal

Tampines

2025

Kitchen Renovation Gallery

Browse real kitchen renovation photos — from simple upgrades to full transformations.

Kitchen Renovation FAQs

Got questions? These are the most common ones we get from HDB homeowners before redoing their kitchen.

Typically 2 to 3 weeks. Resale flats may take longer due to hacking and plumbing reroutes.

Yes — overlaying is possible if existing tiles are in good condition, especially for walls. Floor tiles are usually better off replaced.

Quartz is the most popular for HDB kitchens — durable, heat-resistant, and easy to maintain.

Yes — all standard packages include soft-close hinges. You can upgrade to anti-slam drawers or premium finishes too.

Absolutely. Kitchen-only renovations are very common. Just let us know your layout and style goals.

Copyright 2025 © www.renomoji.com • All rights reserved.